Big smiles to get this project done. What you're looking at is a well organized shed. We plan to build some shelves to further help organize but this project was given a one day time limit.
We had to redo the floor. The kit was for an 8x10 she'd but because it wasn't exactly 8x10 our floor was a bit too big all the way around. Do, that lead to water sitting on the extra floor and doing some damage. We moved it, took out old floor, stabilized frame with even more support, got it back into position on the frame, and finally added the floor to the inside. Big thanks to the Mr as he worked on father's day to get this done.
Green,clean, classy
Shalimar
No comments:
Post a Comment