So there is Mr out in the heat getting the floor frame supported every possible way.
There are an abundance of support boards but even more where our bath tub will be and the supporting wall for upstairs.
All the corners got two extra support brackets with bolts.
Supporting done we got to work on the plumbing.
This is the drain plumbing for all the toilets, sinks, showers, and our tub.
Next up was to get the underside plastic wrapped. It was a roll of 100ft so we cut two pieces and glued them together.
Then taped each side along the seam with gorilla tape.
Doesn't that look awesome?
Where the plumbing was at we cut out the plastic and then secures the opening with more gorilla tape.
That's that.yall keep it green, clean, and classy.
Shalimar
No comments:
Post a Comment